| |
 |
| |
|
 |
|
| |
|
| |
The Service Department hosts a 24 x 7 service in coordination, supervision and monitoring for client's equipment and operations.
|
| |
Pipeline Internal Corrosion Management Services. |
| |
Provision of Pipeline Internal Corrosion Management Services comprises of supply, performance monitoring and optimization of corrosion control chemicals, maintenance and repair of client owned chemical injection systems for the routine continuous and batch application of corrosion control products in on-plot and downhole facilities as well as in oil, water, three phase and gas pipelines. In addition to the above services pigging operations, pig maintenance, pig launcher / receiver maintenance and block valve station maintenance are also done through a nominated sub contractor. |
| |
^Top |
| |
Inspection Services |
| |
We currently provide OCTG Inspection services and drilling rig related inspection services. The scope of work for each activity are as follows :
OCTG Inspection Services
- Visual insp
ection to include OD and ID surface condition, straightness, visual thread inspection.
- Full length internal rattling.
- Internal grit blasting.
- Full length drift.
- Special end area inspection.
- Electromagnetic inspection using four function unit.
- Removal and replacement of API couplings.
- Installation of thread protectors.
- Application of corrosion inhibitor.
- Hardness testing.
Drilling Rig related Inspection Services (TIS)
- Inspection of drill pipes.
- Inspection of BHA.
- Inspection of rig mast & sub-structure.
- Inspection of handling and hoisting tools and rigs.
- Ultrasonic thickness check (compression wave).
|
| |
^Top |
| |
Wireline & Completion Services |
| |
Special Oilfield Services cover all areas of wireline operations such as, but not limited to the following :
- Bottom-hole pressure and temperature surveys.
- Running and pulling down-hole safety valves, plugs, circulating and other down-hole devices.
- Bottom-hole sampling.
- Tubing caliper surveys.
- Running gauges, surveys and paraffin cutting.
- Gas lift operations.
- Cement plugs.
- Fishing operations.
- Running and pulling packers and other related completion tools.
- Liner Hanger Services.
Wireline equipment designed and manufactured by Special Oilfield Services conform to API specifications and the latest NACE standards.
The Equipment comes as :
- Wireline Units (Single/Double Drum).
- Skid and Truck mounted.
- Inspection of rig mast & sub-structure.
- Inspection of handling and hoisting tools and rigs.
- Ultrasonic thickness check (compression wave).
|
| |
^Top |
| |
Production Testing Services |
| |
Special Oilfield Services high quality TESTING SERVICES can provide for evaluating the production capability in onshore operations :
- PRODUCTION - TESTING.
- WELL-TEST INTERPRETATION.
- PRODUCTION MANPOWER SUPPLY.
Equipment
All range of equipment is available in standard or sour (H2S) service, Offshore skid, truck trailer mounted and sized to customer requirements.
The existing equipment includes, but are not limited to :
- Choke Manifolds.
- Indirect Gas/Diesel Fired Heaters.
- Three Phase test Separators.
- Gauge / Surge tanks.
- Crude Oil VBurners And Booms.
- Bottom-Hole And Surface Sampling Equipment.
- Bottom-Hole pressure And Temperature Gauges.
Personnel
Experienced well-testing Engineers, Supervisors and Operators of SOS have successfully managed Production Services by planning, supervising and executing projects from the intial contact with clients to the final well-test report, throughout the Middle East. |
| |
|
| |
Non Destructive Testing Services |
| |
| Methods |
Specifications |
Scope of work |
| Magnetic Particle Inspection |
ASTM & BS Standards |
- Fluorescent and Visible Magnetic Particle ( Dry & Wet ) Inspection of Weld joints, Castings and End Connections and Critical areas of Drilling and Production Tubulars
|
| Dye Penetrant Inspection |
ASTM & BS Standards |
- Fluorescent and Visible Dye Penetrant Inspection ( Solvant Removable and Water Washable) of Non Magnetic materials , Drilling Tools , Plates and Weld joints
|
| Ultrasonic Testing |
ASTM & BS Standards |
- Corrosoin Monitoring of Pressure Vessels, piping and Static Equipments .
- Ultrasonic Flaw Detection for weld Integrity .
- Ultrasonic Thickness gauging using A Scan ,Direct read out and paint through thickness gauges.
- Corrosion gray scale marking on relevant isometric drawing as per the requirements of certification body
- Complimentary NDT ( MT, ET or PT ) , where applicable
|
| Eddy Current Inspection |
ASTM & BS Standards |
- Eddy Current Inspection on Critical/ Stress Areas ( if accessible ) of Derrick, Mast & Substructure
- Eddy Current Inspection on Weld joints
|
|
| |
|
| |
OCTG & Rig Floor Tubing Inspection |
| |
| Range |
Specifications |
Scope of work |
2-3/8”
To
5-1/2” Tubing &
4-1/2”
To
30” Casing |
API Standard |
- Internal and external Surface Inspection
- Full Length Drifting
- Visual Thread Inspection
- Residual Field Magnetic Field Induction
- Coupling Removal and Re-installation.
- Internal Coating
- Four Function Inspection
- Well TechIV Rig Floor Tubing Inspection
- Internal External Pipe Cleaning
|
Mfg’s / Client
Requirements |
|
| |
|
| |
Drill Pipe Inspection |
| |
| Range |
Specifications |
Scope of work |
2-3/8”
To
5-1/2” |
API Standard |
- Visual Connection and Dimensional Inspection of Tool Joint
- Visual, OD Gauging, Electromagnetic Inspection and UT Wall Thickness on Tube
- Internal Optical Inspection
- Integrated Computerized Reports
|
| DS 1 Standard |
- Visual ConnectionDimensional 1&2 and Black Light on Tool Joint
- Visual Tube, OD Gauge, UT wall, UT upset/ Slip, MPI Upset/Slip and EMI 1&2 on Tube as per the requirements of Category 1-5
- Integrated Computerized Reports
|
| NS 2 Standard |
- Visual ConnectionDimensional Inspection and Black Light on Tool Joint
- Visual Tube, OD Gauge, UT wall, UT upset/ Slip, MPI Upset/Slip Profile check on MIU Length and EMI on Tube
- Integrated Computerized Reports
|
|
| |
|
| |
BHA ( Bottom Hole Assembly )Inspection |
| |
| Material |
Specifications |
Scope of work |
| Drill Collar |
API Standard
DS1 Standard
NS2 Standard |
- Visual Connection, Dimensional Inspection and Black Light on Tool Joint
- Visual , MPI Elevator Groove/ Shoulder on Body
- Integrated Computerized Reports
|
| HWDP |
DS1 Standard
NS2 Standard |
- Visual Connection , Dimensional Inspection and Black Light Connection on Tool Joint
- Visual Tube, MPI Upset, on Tube Body
- Integrated Computerized Reports
|
Other
Drill Stem
Components |
API Standard
DS1 Standard
NS2 Standard |
- Visual Connection, Dimensional Inspection and Black Light on Tool Joint
- Visual Tube, MPI of Critical/ Stress Areas /Upset, on Body
- Integrated Computerized Reports
|
|
| |
|
| |
Drilling Jar/ Motor/ Mwd/ Lwd Shop Inspection |
| |
| Material |
Specifications |
Scope of work |
Drilling Jar/
Motor Assembly |
DS1 Standard
NS2 Standard
Clients/ Mfg’s
Specifications |
- Visual Connection, Dimensional Inspection and Black Light on Tool Joint
- Visual Body , Ring Gauge and MPI of Critical/ Stress Areas /Upset, on Body
- Integrated Computerized Reports
|
MWD/
LWD Tools |
DS1 Standard
NS2 Standard
Clients/ Mfg’s
Specifications |
- Visual Connection , Dimensional Inspection and Black Light Connection/ Liquid Penetrant Inspection on Tool Joint
- Visual Tube, MPI / LPI Upset, on Tube Body
- Integrated Computerized Reports
|
Other
Specialty
Components |
Clients/ Mfg’s
Specifications |
- Visual Connection, Dimensional Inspection and Black Light on Tool Joint
- Visual Tube, MPI of Critical/ Stress Areas /Upset, on Body
- Integrated Computerized Reports
|
|
| |
|
| |
Handling Tool Inspection |
| |
|
Material |
Specifications |
Scope of work |
Hooks,
Traveling
Blocks,
Tongs, Slips,
Elevators,
Links,
Swivels,
Clamps, |
API RP 8B
Category III
&
Category IV
as defined
by the Mfg |
- Visual Examination of body including Connection (if any )
- Magnetic Particle Inspection on Critical/ Stress Areas
( if accessible ) of Body
- Integrated Computerized Reports
|
|
| |
|
| |
Mast & Substructure Inspection |
| |
| Material |
Specifications |
Scope of work |
Drilling Mast,
Drilling Derrick
& Substructure |
API RP 4G
Category III
&
Category IV
as defined
by the Mfg |
- Visual Examination of Critical/ Stress Areas
( if accessible ) of Derrick, Mast & Substructure - Eddy Current Inspection on Critical/ Stress Areas
( if accessible ) of Derrick, Mast & Substructure
- Magnetic Particle Inspection on Critical/ Stress Areas
( if accessible ) of Derrick, Mast & Substructure - Integrated Computerized Reports
|
|
| |
|
| |
Loose Lifting Gear Inspection |
| |
|
Material |
Specifications |
Scope of work |
Cargo Baskets,
Slings,
Shackles,
Chain/Snatch
Blocks,
Etc.. |
BS:2903
BS:3032
BS:3243
BS:12079
API 9A
API 2D |
-
Material Identification
- Visual Examination and Dimensional Inspection
- NDT ( MT, ET or PT ) , where applicable
- Proof testing , where applicable
- Integrated Computerized Reports
|
|
| |
|
| |
Crane Inspection |
| |
| Material |
Specifications |
Scope of work |
Pedestal,
Overhead,
Runway Beam,
And
Davit |
BS:7121
&
Relevant
International
Standards |
- Material Identification
- Visual Examination and Dimensional Inspection
- NDT ( MT, ET or PT ) , where applicable
- Proof testing , where applicable
- Integrated Computerized Reports
|
|
| |
|
| |
|